Section 261
For the purpose of this Chapter-
of Merchant Shipping (Safety Convention) Regulations, 2003
Subsidiary LegislationIn forceProvision 295 of 319
Section 261
919
"craft constructed" means a craft the keel of which is laid or which is at a similar stage of construction;
"high speed craft" is a craft of a maximum speed in metres per second [m/s)
equal to or exceeding